Power Trench 1
We started digging the trench for our main power
feed that will be installed on Thursday. 04/11
Power Trench 2
We continued digging the trench until 10pm and
we were able to get 90% of the trench completed.
We will need to finish it in the morning before the
electrician arrives. 04/12
Power Trench 3
Power Trench 4
We completed the trench this morning and the
Trevor from Hawk Electric showed up to install the
main power feed cable. The inspector arrived
shortly after and we then backfilled the trench.
Once we get the building up we will mount all of the
panels and connect it all up. 04/13
Power Trench 5
Low Voltage 1
We started the trench today for the High Speed
Internet and DirecTV feeds to the building.  04/13
Low Voltage 2
Low Voltage 3
We completed the High Speed Internet and
DirecTV  trench. We installed the EMT and
backfilled over it. Once we get the building up we
will install the cabling. 04/14
Low Voltage 4
Low Voltage 5
Trevor from Hawk Electric showed up this morning
and completed the rough-in for the power panels
in and around the shop. 04/15
Pic 1 - Rough-In for 100 amp panel in the garage.
Pic 2 - This is where the main panel will be.
Pic 3 - This is the rough for the hot tub disconnect.
Pic 4 - This is the rough for the 50 amp RV panel.
Power Rough-In 1
Power Rough-In 2
Power Rough-In 3
Power Rough-In 4
Trevor was out today to install the 200 amp and
100 amp power panels. We will finally have power
in the building so we can stop running the
generator. 07/11
Pic 1 - Pulling in the main power cables for the 100
amp panel.
Pic 2 - Trevor working in the 200 amp panel.
Power 1
Power 2
We completed the High Speed Internet and
DirecTV  trench. We installed the EMT and
backfilled over it. Once we get the building up we
will install the cabling. 04/14
We got the power for the hot tub and the septic
system completed.
08/11
Hot Tub / Septic 1
Hot Tub / Septic 2